Production

Project Highlights

—Total Land Area: 348,803 sq.ft.

—Build up Area: 226,238 sq.ft.

 

Building Description

Area Sq.ft.

1

Main Building & A/C Plant

143,442

2

Utility Building & WTP

8,380

3

Worker Accommodation

11,808

4

Warehouse

51,591

5

Bonded Warehouse

3,430

6

Canteen, Dinning, Kitchen, Garrage

3259

7

Guard RMS & RCC building

927

8

Doctor, Child Care & Training Room

1,281

9

Maintenance Room

936

10

Mosque

352

11

Wastage Shed & Main Gate

832

Raw Material

—Cotton Consumption: 1300 mt/month

—Lycra Consumption: 3.5 mt/month

—Recycled Fibers Consumption: as per requirements

—

—Countries from where cotton to be imported
- Africa
- Brazil
- USA
- Greece
- India

Products

—Open End

—Open End Slub

—Carded Ring

—Carded Ring Slub

—Combed

—Combed Compact

—Multi Count

—Multi Twist

—Cotton Spandex

—Cotton Spandex Slub

—Siro, Siro Slub

—Organic, IC-1, IC-2

—PCW (Pre/Post)

 

Man Power

—130 workers on an average  are working per shift now.

—Total no of employees in Argon Spinning Limited is currently about 550.

 

Power Supply

 

—Argon Spinning Ltd. have 4 gas generator of 1,030 KW
Total Capacity: 4.12 MW

—REB Capacity: 3 MW

—Solar Capacity: 508 KWP

Process Flow

—The process flow is showed for three types of yarn

i. Carded Yarn
ii. Combed Yarn
iii. Open End Yarn

Capacity Allocation

Sl No

Frame No

No of MC

Count Range

 Capacity (kg/day)

 Capacity (MT/month)

1

1~3

3

Ne-7 ~ Ne-20 + 40D/70D

       3,500

105

2

4~9

5

Ne 8 ~ Ne 12

       7,500

225

3

10~12

4

Ne 6.5 ~ Ne 7

       8,500

255

4

13~20

8

Ne 10~ Ne 20

     10,500

315

5

21~24

4

Ne 20 ~ Ne 30

       3,500

105

 

Total

24

 

     33,500

1,005

6

Rotor

2

Ne 6 ~ Ne 16

       9,500

285

 

Grand Total

 

 

     43,000

1,290

Blowroom

  1. i. BDT
    automatic fire protection - ARGUS
  2. SP-EM
    electronic metal separator - Trutzschler
  3. SP-FPU/TS-T3
    foreign parts separator - Trutzschler
  4. AD-50eS
    spark diverter – ARGUS
  5. SP-DX
    dust extraction – Trutzschler
  6. Waste Collection
    continues – AIRLIN

Carding

I, Magno Top
   All m/c`s equipped – Trutzschler

  1. T-con Safety
    All machines equipped- Trutzschler
  2. Waste Collection
    continues - AIRLIN

Draw Frame

  1. i. Double head delivery

Simplex

  1. i. Auto doffing with roving transport
    MARZOLI
    Individual roving spindle monitoring
    04 M/c`s -MARZOLI
  2. Over Head Cleaner
    every individual m/c`s -Trascar/SIEGER

Auto Transport

  1. i. Automated roving transport from
    simplex to ring
  2. Automated yarn transport from
    ring to auto cone (linked)

Ring

  1. i. MP-1N – All m/c`s Slub Attachment
    multi-count, multi-twist,
    multi-count+multi twist, slub+multi-count,
       slub+multi-twist,
       slub+multi-count+multi-twist – MARZOLI
  2. Core yarn attachment – AMSLER
  3. G-38 – 05 M/c`s slub attachment (Printer),
    all machines ISM.- RIETER
  4. Over Head Cleaner
    every individual m/c`s – SIEGER/ Trascar
  5. Auto Doffing
    all machines MP-1N/ G-38 

Autocone

  1. i. Yarn Clearer
    all machine yarn clearer- Quantum-3- Uster
  2. Foreign Matter Clearing
    all machines - Uster
  3. Vegetable Matter Clearing
    all machines – Uster
  4. Polypropylene Clearing
    05 M/s` Savio Polar-IDLS
    all m/c`s Eco-pulsar – Uster
  5. Over Head Cleaner
    every individual machine- SAVIO
  6. Link Machine
    all ring frame link with Savio
  7. Core Yarn Missing Monitoring
    03 machines S – Uster
  8. Twin Splicer
    03 machines for core yarn – Savio
  9. Moist Splicer
    21 machines SAVIO Polar &
    Eco-pulsar- MESDAN

Rotor

  1. i. Over Head Cleaner
    R-35, every individual machines- RIETER
  2. Yarn Compensator during Doffing
    RIETER 
    iii. Yarn Clearer
       all spindles Q10 –RIETER
  3. Slub Attachment- 1 machine OPEN-END
    AMSLER